Sell -- IRON ORE LUMP 64,5%, Rejection 63.5% Brazil Origin. |
|
|
|
||||||||||||||||||||||||||
| We can supply high quality IRON Ore, Brazil Origin.
IRON Ore Spec as followings. SPECIFICATIONS Iron Ore, Fe 64.5% - Rej below 63.5% Fe 64.50% Rej below:63.5 % Al2O3 0.070% Rej below 2.00 % SiO2 2.08% Rej below 5.00 % S 0.007% Rej below 0.03 % P 0.041% Rej below 0.05 % Mgo <0.1%Max K2o 0.02% Cao 0.02% Na2o <0.01%Max Tio2 0.08% Mn 0.55% Sn Chromium Zinc Lol Moisure 8.0% SIZE 0.15mm 90% 10.3mm 10% Capacity: 1,000,000~1,500,000MT/month Packing: LOOSE BULKS Price Terms: CIF ASWP from main port in Brazil to Any main sea Port. Lead Time: FIRST DELIVERY IN THE TERM OF: 45/60 days in DESTINATION PORT /DELIVERY PORT. After the first vessel arrived at the destination,subsequent deliveries will become the last 30/35 days. By this way,until all the monthly deliveries fulfill the contract. PAYMENT TERMS AND CONDITIONS: 1,Monthly Payments will be by Irrevocable letter of credit, transferable,confirmed, unconditional, irrevocable, divisible for a month amount(United State Dollar), issued by our top 50 World Bank, active and operative, valid per the term of the contract (365 days) and with payment 100% 5 days after the cargo arrived at destination. The payment of the ARDLC shall be made to the Seller, and to the Seller indicated Bank, and payment will be upon the presentation 100% of each shipping documents at the destination port including CIQ or SGS to ensure the quality and send it to the seller. The Buyer will receive the Bill of Lading for the quantity and quality certificates approved by SGS or equivalent international Inspectors, available at each loaded vessel at port of loading. 2,PB: The Operational Performance Bond of 1.5% will be delivered by the value of one month of purchase, or for each shipment, depending on the form of service. First we receive the payment instrument active and operative, issued by the buyer, seven (7) business days after delivery of the PB 1.5%
|
||||||
Related Keywords:
Iron Ore |
||||||