Sign In | Join Free | Messenger | Inquiry Basket () | Help

Sell Shanghai 7U Semi-auto Block Making Production Line

Total 9 Related Items prev Prev     Next next

Sell Shanghai 7U Semi-auto Block Making Production Line
Inquire now
Date Posted : 2009/06/23
Category : Manufacturing & Processing Machinery > Construction Material Making Machinery > Brick Making Machinery
Offer Type : Sell
View Larger Picture
 
Shanghai 7U Machinery Co., Ltd

Membership Type : Free member
Registration Date : 2008-04-03
Country/Region : Malaysia China
Address : 9#, No.285 Tiangong Road, Jinshan area, shanghai, china Shanghai Shanghai, China
Phone : 86-21-37286050
Fax : 86-021-57273675
Contact : rogerzhu

View all selling leads of this member(9)
View all products of this member (8)

Check this company's business credentials, background and level of reliability
Shanghai 7U Machinery Co., Ltd
For this producion line only, it is composed by a main machine (7U-QTseries main machine), a mixer(JS500/750 mixer),a batching plant(PL1200/PL1600 batching plant), a cement screw conveyor,a portable stacker.
To set up a block plant with this production line, it needs about 6000 square meters of land spaces, most of them is used as curing area.
In this production line, raw batching system is adopted (batching plant and cement measuring device), which increases the batching ratio accuracy of raw material, thus improves the quality of concrete; it can also effectively prevent cement from being wasted, reducing the cost of customers.
All equipments are controlled by central PLC system, easy to operate. Just need one workers to operate batching system, mixing system, block making system and stacker.
The production line is very good for medium investors to start block business. The whole factory need about 7-8 workers. The flow of work is as follow:
1.        One worker sends the aggregate into hoppers of batching plant by wheel loader. And then the batching plant can measure all the kinds of aggregate automatically and correctly.
2.        One worker operates all the machines in the control room.
3.        When the blocks are stacked layer by layer, 2 workers transport them to curing area by hydraulic lift or forklift (2 sets).
4.        After one day in curing area, the blocks have strong enough and the 4 worker transport them into storage area and after 25 days, the blocks can be used.

When our production lines arrive to your block factory, you just need to build a cement silo, buy 2-3 forlift or hrdraulic lift to start producing blocks!

If you are interested in our machines, please feel free to contact us: rogerzhu at 7umachine dot com; or rogerzdy at gmail dot com.


Other Selling Leads of this member (8 more)
Sell Shanghai 7U Block Making Machine

Sell Shanghai 7U Block Making Machine

Shanghai 7U Machinery Co., Ltd located in economy leading city of China, Shanghai; At present, we specialize in designing and manufacturing machinery for making wall block, brick, road paver, and roof tile. We are a growing enterprise, with factory l...
Sell QT Seriesblock making machine

Sell QT Seriesblock making machine

Shanghai 7U Machinery Co., Ltd block machine, concrete block making machine, brick machine, brick making machine. Shanghai 7U Machinery Co., Ltd located in economy leading city of China, Shanghai; at present, we specialize in designing and manufact...
Sell single simple production line with full-auto block making machine

Sell single simple production line with full-auto block making machine

Introduction of Production Line: There are two kinds of machine in this line, main block machine and mixer. Main block machine is operate by PLC, work automatically. Mixer should be operate on manual. Simple production line is good for customer wh...