<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Buying Leads Catalogs - erectal]]></title>
<link><![CDATA[https://www.ec21.com/offers/erectal--2673/1/erectal.html]]></link><item>
<title><![CDATA[Buy  Pwer Plant &amp; Transmission Line by Bid]]></title><link><![CDATA[https://importer.ec21.com/Buy_Pwer_Plant_Transmission_Line--9146526.html]]></link><description><![CDATA[Erection Testing Commissioning of 230 KV Transmission line. Lot 1 55 KM , Lot 2 55 KM Lot 3 55 KM.
Interested companies]]></description><pubDate><![CDATA[20100513]]></pubDate></item>
<item>
<title><![CDATA[Need Urgently Sandblasting Cabins &amp; Blasting Rooms]]></title><link><![CDATA[https://importer.ec21.com/Need_Urgently_Sandblasting_Cabins_Blasting--9505991.html]]></link><description><![CDATA[erection, with little or no job site welding required. 
The enclosure stands by it&apos;s own structural support without con]]></description><pubDate><![CDATA[20100806]]></pubDate></item>
<item>
<title><![CDATA[Buy BLASTING ROOM]]></title><link><![CDATA[https://importer.ec21.com/Buy_BLASTING_ROOM--9546861.html]]></link><description><![CDATA[erection, with little or no job site 
welding required. 
The enclosure stands by it&apos;s own structural support without co]]></description><pubDate><![CDATA[20100806]]></pubDate></item>
<item>
<title><![CDATA[Buy PU Continuous Production Line]]></title><link><![CDATA[https://importer.ec21.com/Buy_PU_Continuous_Production_Line--19244161.html]]></link><description><![CDATA[erection and commissioning requirements including your personnel costs and cost of recommended spares.
What is the anti]]></description><pubDate><![CDATA[20121213]]></pubDate></item>

</channel>
</rss>