<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - construction bag]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/construction_bag--280204/1/construction bag.html]]></link><item>
<title><![CDATA[2.0mm 2.5mm Mill Finished Aluminum Sheet Plate 1100 H14]]></title><link><![CDATA[https://aluminumcoilsheet.en.ec21.com/2.0mm_2.5mm_Mill_Finished_Aluminum--12064800_12065928.html]]></link><description><![CDATA[construction material.boat deck, air plane, temperature preservation tube packaging anti-slip floor decoration, mould, oil tank ect.1~3TONS (According to specifications) Future Goods: 25-35 days, Rea]]></description><pubDate><![CDATA[20260210]]></pubDate></item>
<item>
<title><![CDATA[Aluminum Sheet]]></title><link><![CDATA[https://dxsteelgroup.en.ec21.com/Aluminum_Sheet--11753392_11753402.html]]></link><description><![CDATA[construction, etc.
Feature
Good rust resistance, not suitable for heat treatments, good corrosion resistant
performance, well welding property, good plasticity, low strength but suitable
for cold wor]]></description><pubDate><![CDATA[20230321]]></pubDate></item>
<item>
<title><![CDATA[Aluminum Chequered PLATES-5 Bars Shape]]></title><link><![CDATA[https://aluminumplates.en.ec21.com/Aluminum_Chequered_PLATES_5_Bars--7332410_7332772.html]]></link><description><![CDATA[bag packed on wooden pallet which is suitable for long-distant ocean transportation.
Production time
20-25 days after LC or TT deposit received
End use
for industrial and constructional use
3,Packing]]></description><pubDate><![CDATA[20121126]]></pubDate></item>

</channel>
</rss>