<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - rubber frame]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/rubber_frame--0719/1/rubber frame.html]]></link><item>
<title><![CDATA[BERCO ID2055 Sprocket]]></title><link><![CDATA[https://ins888go.en.ec21.com/BERCO_ID2055_Sprocket--12024308_12024313.html]]></link><description><![CDATA[Definition: What’s the role of Sprocket for earthmoving equipment?
Sprocket is in the back of the track frame. Because it is fixed on the track frame, it has no shock absorption function. If sprock]]></description><pubDate><![CDATA[20241114]]></pubDate></item>
<item>
<title><![CDATA[Custom Rubber Track Undercarriage with Sriangle Track for Fire Fighting Robot Crawer Chassis]]></title><link><![CDATA[https://sales147258.en.ec21.com/Custom_Rubber_Track_Undercarriage_with--11500299_11508119.html]]></link><description><![CDATA[Rubber track or steel track undercarriage, and need the middle frame.b. Machine weight and undercarriage weight.c. Loading capacity of the track undercarriage ( the weight of the whole machine exclud]]></description><pubDate><![CDATA[20230210]]></pubDate></item>
<item>
<title><![CDATA[2.5 Tons Rubber Track Undercarriage for Spider Lift Aerial Working Platform with Non Marking]]></title><link><![CDATA[https://yjhglisa.en.ec21.com/2.5_Tons_Rubber_Track_Undercarriage--11254892_11260288.html]]></link><description><![CDATA[Rubber track or steel track undercarriage, and need the middle frame.
b. Machine weight and undercarriage weight.
c. Loading capacity of the track undercarriage ( the weight of the whole machine excl]]></description><pubDate><![CDATA[20221013]]></pubDate></item>

</channel>
</rss>