<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - 6]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/6--0743/1/6.html]]></link><item>
<title><![CDATA[Concrete Formwork Accessory Steel Tie Rod 15/17mm 10/12mm 20/22mm]]></title><link><![CDATA[https://lhformwork.en.ec21.com/Concrete_Formwork_Accessory_Steel_Tie--12030609_12030610.html]]></link><description><![CDATA[6 meters, depends on customers requirement.Its material are 45# steel and Q235 steel. Breaking load can be 140KN.
Formwork Cold Rolled Tie Rods are specialized steel rods used in concrete formwork sy]]></description><pubDate><![CDATA[20241211]]></pubDate></item>
<item>
<title><![CDATA[Steel Wall Formwork]]></title><link><![CDATA[https://zoloformwork6688.en.ec21.com/Steel_Wall_Formwork--11988984_12020564.html]]></link><description><![CDATA[6 different widths of panels. For pouring in special positions the combination of corner panels and adjustable panels can be used to achieve the pouring requirements. The connection of the panels is ]]></description><pubDate><![CDATA[20241025]]></pubDate></item>
<item>
<title><![CDATA[Anti-slip Film Faced Plywood for Containers Floors]]></title><link><![CDATA[https://jstm1234.en.ec21.com/Anti_slip_Film_Faced_Plywood--12006925_12007101.html]]></link><description><![CDATA[ANTI-SLIP FILM FACED PLYWOOD
SIZE:12x2440MM,1250x2500MM,1525x3050MM, 1525x6000MM.
THICKNESS:6.5MM--21MM
ANTI-SLIP FILM:Black film,Brown film,Red film
CORE:Poplar, Eucalyptus, Meranti,Combi core.
GLUE]]></description><pubDate><![CDATA[20240919]]></pubDate></item>
<item>
<title><![CDATA[Moulding Separating Oil Release Agent Eloi Betonus EAC 1000L IBC]]></title><link><![CDATA[https://amdslt.en.ec21.com/Moulding_Separating_Oil_Release_Agent--12005615_12005631.html]]></link><description><![CDATA[6743: ISO-L-B
Typical characteristics
Test Unit Average result
Density at 15°C kg / m³ 835
Viscosity at 40°C cSt 6,03
Pour point °C -27
Flash point COC °C 93
Distillation to 350°C Mg KOH/g 3,3
]]></description><pubDate><![CDATA[20240916]]></pubDate></item>
<item>
<title><![CDATA[Commercial Plywood]]></title><link><![CDATA[https://haiphuplywood.en.ec21.com/Commercial_Plywood--8212167_9766921.html]]></link><description><![CDATA[
- Glue: Urea formaldehyde 
- 02 times of hot presses 
- Sanding core assembly 
- Moisture: below 13% 
- Tolerance thickness: +/- 0.3mm 
- Thickness: From 6mm to 18mm 
- Measurement: 4 x 8 or 3 x 6]]></description><pubDate><![CDATA[20151124]]></pubDate></item>
<item>
<title><![CDATA[2016 Top OEM Service 17mm 45# Formwork Tie Rod Wing Nut for Construction Building]]></title><link><![CDATA[https://200820092007.en.ec21.com/2016_Top_OEM_Service_17mm--10195771_10195837.html]]></link><description><![CDATA[1. Item: Scaffolding formwork tie rod nut for construction material 
2. Size:15/17/20/22mm; 12/14/16mm;
3. Material :Q235, 45#steel;
4. Standard : EN74, BS1139
5. ISO 9001: 1000 is approved;
6. OEM s]]></description><pubDate><![CDATA[20190104]]></pubDate></item>
<item>
<title><![CDATA[Plastic-steel PVC Formwork, PVC Plastic Formwork, PVC Formwork, PVC Shuttering]]></title><link><![CDATA[https://jingfanggrapho.en.ec21.com/Plastic_steel_PVC_Formwork_PVC--10635458_10635459.html]]></link><description><![CDATA[6% (the rest 3~4% is for necessary additives). 
Sizes and thickness
JINGFANG® PVC Shuttering Sheet has the same sizes and applications as plywood formwork:
Width: up to 1300 mm 
Length: no limits 
T]]></description><pubDate><![CDATA[20240323]]></pubDate></item>
<item>
<title><![CDATA[Concrete Shuttering Mason Clamp Depth 180mm Capacity 1000mm Powder Coating Finish]]></title><link><![CDATA[https://chireetools.en.ec21.com/Concrete_Shuttering_Mason_Clamp_Depth--10851990_10852417.html]]></link><description><![CDATA[6in&amp;times;9/32in 
● Weight: 3.10kgs/6.82ibs 
● Surface Finish: Powder Coating 
Other mason clamps with depth 180mm we can make
Depth 
(mm)
Rail Size (mm)
Clamping Capacity (mm)
Overall Length (mm]]></description><pubDate><![CDATA[20181113]]></pubDate></item>
<item>
<title><![CDATA[China ACEALL 4&apos;X8&apos; Construction Shuttering Green PP PVC Plastic Film Coated Plywood Board Lumber]]></title><link><![CDATA[https://aceallgroup.en.ec21.com/China_ACEALL_4_X8_Construction--10846921_10867845.html]]></link><description><![CDATA[Company Name
ACEALL GROUP (Building Material - Plywood)
Product
PP Plastic Film Faced Plywood
Size
1220x2440mm, 1250x2500mm, 1200x1800mm, 610x2440mm
Thickness
6~30mm (Mainly 6 / 9 / 12 / 15 / 18 / 21]]></description><pubDate><![CDATA[20181226]]></pubDate></item>
<item>
<title><![CDATA[High Quality Container Flooring Plywood Face Keruing To Malaysia, Thailand and India Market]]></title><link><![CDATA[https://ellenkego5346.en.ec21.com/High_Quality_Container_Flooring_Plywood--11240245_11240257.html]]></link><description><![CDATA[· 
Face/back:
Keruing
· 
Color:
Red
· 
Core:
100% eucalyptus
· 
Glue: Pure glue no mix or mix melamine (15%)
depending on customer’s demand
· 
Sizes:
3x6’,4x8’….
· 
Packing:
By pallets,]]></description><pubDate><![CDATA[20200825]]></pubDate></item>
<item>
<title><![CDATA[Hot Rolled Tie Rod 15/17 Dywidag Tie Rod Formwork Tie Rod Formwork Material]]></title><link><![CDATA[https://formscaffs.en.ec21.com/Hot_Rolled_Tie_Rod_15--10988134_11038839.html]]></link><description><![CDATA[6mm
Material
Carbon Structural Steel Q235/45#
Process
Thread rolling
Length
1-6m or customized
Weight
1.5kg/m
Failing loading
≥14.5T
Surface treatment
Original , electro galavanied or as your requi]]></description><pubDate><![CDATA[20210818]]></pubDate></item>
<item>
<title><![CDATA[Plastic Formwork Building System for Beam]]></title><link><![CDATA[https://kehoon.en.ec21.com/Plastic_Formwork_Building_System_for--10938297_10941076.html]]></link><description><![CDATA[modular plastic formwork for concrete wall column:
\
1. Material: ABS +Glassfiber
2. Weight: 15 KGS/SQM
3. Loading capacity: 60KN/SQM
4. Size: plastic formwork for round column:
height :750mm
diamete]]></description><pubDate><![CDATA[20190416]]></pubDate></item>
<item>
<title><![CDATA[Mine Tunnel Formwork System]]></title><link><![CDATA[https://lijianformwork.en.ec21.com/Mine_Tunnel_Formwork_System--10981656_10981701.html]]></link><description><![CDATA[6. Formwork project scheme,manufacturing, technical consulting, remote or on site guidance. 
7. After-sale service and technical support.
8. Product installation and construction service.
Lijian form]]></description><pubDate><![CDATA[20200925]]></pubDate></item>
<item>
<title><![CDATA[PP Plastic Construction Formwork]]></title><link><![CDATA[https://yaohang1234.en.ec21.com/PP_Plastic_Construction_Formwork--11841888_11841904.html]]></link><description><![CDATA[60-100 times
20-30 times
4 to 6 times
Around 50 times
Drop test(10m)
unbroken
unbroken
rupture
broken
Corrosion Resistance
Good
No
No
No
Abrasion resistance
wear-resistant
wear-resistant
No
No
After ]]></description><pubDate><![CDATA[20230906]]></pubDate></item>

</channel>
</rss>