- Group Products
- All Products
- 1 Product Per Company
- Supplier Country
-
- China (4)
- Search Options
- Show Premium Suppliers
- Subscription
- Trade Alert
Notify me of new progressive frames info. - RSS Feeds
- My Recent History
Place of origin:
China
progress. 5. Customization. Various specifications, any size, thickness can be customized according to the requirements of building engineering, production line once forming, reduce the cost of cutting time, speed up the progress of the project. 6.Easy maintenance. Hollow plastic formwork does not absorb water, does not crack, does not deform, alkali-resistant anticorrosion, flame retardant and w
[Related Keywords : building formwork]
Business Type
Manufacturer
Location
Hebei, China
Employees Total
11 - 50
Annual Revenue
USD 2,000,001 - 5,000,000
Place of origin:
China
progress. 5. Customization. Various specifications, any size, thickness can be customized according to the requirements of building engineering, production line once forming, reduce the cost of cutting time, speed up the progress of the project. 6.Easy maintenance. Hollow plastic formwork does not absorb water, does not crack, does not deform, alkali-resistant anticorrosion, flame retardant and
[Related Keywords : Hollow Plastic Formwork Board]
Business Type
Manufacturer
Location
Hebei, China
Employees Total
11 - 50
Annual Revenue
USD 2,000,001 - 5,000,000
Place of origin:
China
progress. Installation Instructions of Formwork Accessories Plastic 1.Ues the hollow building formwork intersecting laid with 15mm thick. 2.(1)Wood square of the distance on the surface of the intersection spacing wood square distance according to the thickness of the slab concrete in general the thickness of less than 0.15m floor spacing is 200~250m. (2)The shear wall or sample using the formwor
[Related Keywords : plastic building formwork]
Business Type
Manufacturer
Location
Hebei, China
Employees Total
11 - 50
Annual Revenue
USD 2,000,001 - 5,000,000
Place of origin:
China
progress. Installation Instructions 1.Use the hollow building formwork intersecting laid with 15mm thick. 2.(1)Wood square of the distance on the surface of the intersection spacing wood square distance according to the thickness of the slab concrete in general the thickness of less than 0.15m floor spacing is 200~250m. (2)The shear wall or sample using the formwork (15mm thickness spacing is 100
[Related Keywords : plastic building formwork]
Business Type
Manufacturer
Location
Hebei, China
Employees Total
11 - 50
Annual Revenue
USD 2,000,001 - 5,000,000
Competitive progressive frames products from various progressive frames manufacturers and progressive frames suppliers are listed above, please select quality and cheap items for you.
![]() |
Recommended Content