<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - move explosive]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/move-explosive--2643/1/move explosive.html]]></link><item>
<title><![CDATA[HD-t100b Tractor Drilling Rig]]></title><link><![CDATA[https://irinaliudrills.en.ec21.com/HD-t100b-Tractor-Drilling-Rig--9881401_10086388.html]]></link><description><![CDATA[Explosive method
Drilling bit
Mud drilling
100m
φ60x2500
After lifting the drilling pipes
75-90mm
Air drilling
40m
φ60x2500
After lifting the drilling pipes
75-82mm
Auger drilling
20 m
φ50×φ90×]]></description><pubDate><![CDATA[20190321]]></pubDate></item>
<item>
<title><![CDATA[Tundish Dry Vibration Mix]]></title><link><![CDATA[https://sinometalcarbon.en.ec21.com/Tundish-Dry-Vibration-Mix--11074341_11110720.html]]></link><description><![CDATA[moved.
(5) If there is a crack of ≥3mm in the permanent lining of the tundish, it must be repaired first, and the repairing material must be dried before construction.
(6) Evenly apply 2~3mm releas]]></description><pubDate><![CDATA[20211214]]></pubDate></item>

</channel>
</rss>