<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - with square pipe]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/with_square_pipe--2643/1/with square pipe.html]]></link><item>
<title><![CDATA[New Condition High Efficiency YGM4121 Raymond Powder Mill for Rock Phosphate]]></title><link><![CDATA[https://nclirik.en.ec21.com/New_Condition_High_Efficiency_YGM4121--10912172_10912320.html]]></link><description><![CDATA[square meter space, 8 meter height . Total production line need 2-3 workers, one for raw material feeding , one for operation and maintenance , the last one for final packing .
6. Long lifecycle of w]]></description><pubDate><![CDATA[20190220]]></pubDate></item>
<item>
<title><![CDATA[Hexagonal Kelly]]></title><link><![CDATA[https://hbmccarbon68.en.ec21.com/Hexagonal_Kelly--10964119_10995843.html]]></link><description><![CDATA[square and hexagonal. In rotary drilling, when it is drilling, kelly connected with square bushing and rotary bushing, transfer the ground rotary torque to Heavy Weight Drill Pipe
and to drive the dr]]></description><pubDate><![CDATA[20200523]]></pubDate></item>
<item>
<title><![CDATA[Electric Water Well Drilling Machines]]></title><link><![CDATA[https://runyuan676.en.ec21.com/Electric_Water_Well_Drilling_Machines--11050017_11054545.html]]></link><description><![CDATA[square meter) and the height of the bracket is 2 meters, which can be installed in less than ten minutes. Can be used indoors and outdoors. 2 Well pipes are completely closed and there is no leakage ]]></description><pubDate><![CDATA[20200116]]></pubDate></item>
<item>
<title><![CDATA[API 8C TA Center Latch Elevator]]></title><link><![CDATA[https://deltapetro.en.ec21.com/API_8C_TA_Center_Latch--11586871_11586881.html]]></link><description><![CDATA[API 8C TA Center Latch Elevator 
Model TA center latch elevator with square shoulder are suitable for handling drill pipe, drill collar, casing and tubing. The products shall be designed and manufact]]></description><pubDate><![CDATA[20220614]]></pubDate></item>
<item>
<title><![CDATA[Drill Pipe Tong ZQ203-100 Idler Shaft 0102-05M | RUSHI]]></title><link><![CDATA[https://klk455.en.ec21.com/Drill_Pipe_Tong_ZQ203_100--11872763_11872771.html]]></link><description><![CDATA[pipe power tong accessories ZQ203 full set of fasteners assembly 125 19.1300-00
PLUG, PIPE -SQUARE HEAD NOV, 53002-48-C
WASHPIPE &amp; PACKING CARTRIDGE, Part No: 6142
Bearing Ball MPN# 3910739
Drilling ]]></description><pubDate><![CDATA[20231203]]></pubDate></item>
<item>
<title><![CDATA[Extracting Ilmenite Magnetic Separator Equipment for Iron Ore  Separating]]></title><link><![CDATA[https://hn0626hcg.en.ec21.com/Extracting_Ilmenite_Magnetic_Separator_Equipment--10052912_10055947.html]]></link><description><![CDATA[with the cylinder, and under the water flow of the discharging spray pipe, it will be discharged to the concentrate chute. If the roller is all magnetic roller, the ore discharging is completed by br]]></description><pubDate><![CDATA[20160708]]></pubDate></item>

</channel>
</rss>