<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - raw recorder]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/raw-recorder--2673/1/raw recorder.html]]></link><item>
<title><![CDATA[Heating Oven]]></title><link><![CDATA[https://hengjiujinye.en.ec21.com/Heating-Oven--11982428_11982656.html]]></link><description><![CDATA[recorder 13. Appearance selection (hammer pattern paint, flat light paint, orange pattern paint, spray paint, baking paint)
Industrial oven is a large-scale heating equipment used in industrial produ]]></description><pubDate><![CDATA[20240809]]></pubDate></item>
<item>
<title><![CDATA[Reliable Inspection Company/Quality Inspection Report]]></title><link><![CDATA[https://hqcinspection2022.en.ec21.com/Reliable-Inspection-Company-Quality-Inspection--11735512_11737024.html]]></link><description><![CDATA[records to confirm the supplier is legal, not fake. 
(3) Production line check - Check all production lines in the factory. Check the proportion of the supplier. Check the production records.
(4) Qua]]></description><pubDate><![CDATA[20240220]]></pubDate></item>
<item>
<title><![CDATA[Pilot System High Quality Water Chiller]]></title><link><![CDATA[https://wxpca001.en.ec21.com/Pilot-System-High-Quality-Water--5675435_8416154.html]]></link><description><![CDATA[raw material process
Program Editor
20 programs, each program can edit 45 steps.
Communication protocol
MODBUS RTU Protocol, RS 485 Interface
Temperature feedback
Heat-conducting medium: PT100 Raw ma]]></description><pubDate><![CDATA[20180608]]></pubDate></item>
<item>
<title><![CDATA[Yudiansolar/Radiant 60MW Automatic Solar Panel Making Line Solar Module Production Line]]></title><link><![CDATA[https://lashondazhang2010.en.ec21.com/Yudiansolar-Radiant-60MW-Automatic-Solar--10757056_11739504.html]]></link><description><![CDATA[Raw materials;
Step 7: Defect check: uses the EL tester machine to identifying micro-cracks, broken finger wires, and other invisible defects in solar modules;
Step 8: Lamination: after EL tester che]]></description><pubDate><![CDATA[20230303]]></pubDate></item>
<item>
<title><![CDATA[Stub End]]></title><link><![CDATA[https://sstubecn.en.ec21.com/Stub-End--10936669_11010731.html]]></link><description><![CDATA[Raw Material Test Report 
EN10204 3.1 Test Certificate 
Heat Treatment Chart
Heat Treatment Report
Quality Assurance Plan
Inspection and Test Procedure Report
Welding Procedure Specification 
Procedu]]></description><pubDate><![CDATA[20190920]]></pubDate></item>

</channel>
</rss>