<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - transaction systems]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/transaction-systems--2673/1/transaction systems.html]]></link><item>
<title><![CDATA[Central Controller Module UAD155A0111 3BHE029110R0111]]></title><link><![CDATA[https://wwww666666.en.ec21.com/Central-Controller-Module-UAD155A0111-3BHE029110R0111--11939088_11948663.html]]></link><description><![CDATA[system performance. In coupling mode, bypassing FIFOs, VMEbus transactions are directly coupled to the PCI bus (meaning that transfers on VMEbus are not 　　completed until they are completed on th]]></description><pubDate><![CDATA[20240607]]></pubDate></item>
<item>
<title><![CDATA[Factory Manufacture Sand Casting Parts Professional Manufacture Iron Casting and Die Casting]]></title><link><![CDATA[https://ruitengint.en.ec21.com/Factory-Manufacture-Sand-Casting-Parts--11906369_11906373.html]]></link><description><![CDATA[Transaction process?
Consultation → Send the drawing (2D / 3D) →
Confirm requirements → Quoted price → 50% mold fee → Sample making → Sample
confirmation → 50% mold fee → Confirm mass]]></description><pubDate><![CDATA[20240226]]></pubDate></item>
<item>
<title><![CDATA[Energy Saving Electric Aluminum Melting and Holding Furnace]]></title><link><![CDATA[https://danniferwang123.en.ec21.com/Energy-Saving-Electric-Aluminum-Melting--11780989_11782407.html]]></link><description><![CDATA[planned output, and any other relevant information.
What are the payment terms?
Our payment terms are 40% down payment and 60% before delivery, with payment in the form of a T/T transaction.
]]></description><pubDate><![CDATA[20230505]]></pubDate></item>

</channel>
</rss>