<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - foundation engineering]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/foundation_engineering--071899/1/foundation engineering.html]]></link><item>
<title><![CDATA[Hydraulic Vibratory Hammer]]></title><link><![CDATA[https://zzsilas.en.ec21.com/Hydraulic_Vibratory_Hammer--12041820_12042074.html]]></link><description><![CDATA[The hydraulic vibratory hammer, produced by Liaoning Zizhu High-Tech Equipment Co., Ltd., is widely used piling and extracting equipment in foundational construction projects for urban construction, ]]></description><pubDate><![CDATA[20250211]]></pubDate></item>
<item>
<title><![CDATA[Underground Tunnel Construction Shotcrete Machine Automatic Spraying Concrete Wet Shotcrete Machine]]></title><link><![CDATA[https://compressorforsale.en.ec21.com/Underground_Tunnel_Construction_Shotcrete_Machine--11366522_12021053.html]]></link><description><![CDATA[foundation pit slope support, working surfaces on the side holes of civil air defense tunnel walls (can be turned back without moving the vehicle), working surfaces on the top support of horizontal t]]></description><pubDate><![CDATA[20241028]]></pubDate></item>
<item>
<title><![CDATA[Rotary Double Wall Casing Tube Piling Single Wall Casing Pipes for Bored Pile]]></title><link><![CDATA[https://unibusinessjoyce.en.ec21.com/Rotary_Double_Wall_Casing_Tube--8761097_11543354.html]]></link><description><![CDATA[Casings are used to stabilize boreholes in case of the collapse in deep foundation engineering. We produce casing tube with double wall or single wall, casing joint, casing shoe, casing drive adapter]]></description><pubDate><![CDATA[20240311]]></pubDate></item>
<item>
<title><![CDATA[CFG Continuous Auger with Flange Coupling Dia 600mm with CFG Auger Head for CFG Pile Foundation]]></title><link><![CDATA[https://tjdrilling01.en.ec21.com/CFG_Continuous_Auger_with_Flange--10360967_10361374.html]]></link><description><![CDATA[foundation treatment of engineering construction CFG pile composite foundation has been widely used and promoted in the construction field for its low cost, short construction period, perfect reinfor]]></description><pubDate><![CDATA[20171213]]></pubDate></item>
<item>
<title><![CDATA[Excavator Pile Driver Attachments]]></title><link><![CDATA[https://scequipment.en.ec21.com/Excavator_Pile_Driver_Attachments--11891132_11891133.html]]></link><description><![CDATA[foundation projects. This versatile mini excavator pile driver attachment offers numerous benefits, including the ability to effortlessly drive posts, sheet piles, and other foundation materials with]]></description><pubDate><![CDATA[20240120]]></pubDate></item>
<item>
<title><![CDATA[Precast Plant and Technology]]></title><link><![CDATA[https://sonntagabs.en.ec21.com/Precast_Plant_and_Technology--573336_1951653.html]]></link><description><![CDATA[foundation elements. 
The above quantity based on one shift a day ,300 days a year.(you can double it with 2 shifts a day). 
All the equipment give you the possibility to be independent and the capab]]></description><pubDate><![CDATA[20070523]]></pubDate></item>

</channel>
</rss>