<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - case 580]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/case_580--2673/1/case 580.html]]></link><item>
<title><![CDATA[Ultra-high-speed Hot &amp; Cold Color Trace Position Label Trademark Cutting Machine]]></title><link><![CDATA[https://yueyeuniao1112.en.ec21.com/Ultra_high_speed_Hot_Cold--10737675_10737314.html]]></link><description><![CDATA[580
cuts per min;
4, with waste discharge function, to
eliminate the impact of waste label and make machine continuous working;
5, eliminate static electricity devices
can be ruled out the effect of ]]></description><pubDate><![CDATA[20240915]]></pubDate></item>
<item>
<title><![CDATA[Upgrade Kits for Used Semiconductor Equipment]]></title><link><![CDATA[https://allwin21.en.ec21.com/Upgrade_Kits_for_Used_Semiconductor--9763376_9763390.html]]></link><description><![CDATA[cases. The reliability have been improved a lot for most of the tools after upgrading. We designed the upgrade kits for these working tools that can do plug and play and most of them only need 2 to 3]]></description><pubDate><![CDATA[20240514]]></pubDate></item>
<item>
<title><![CDATA[Steel Backing Rings]]></title><link><![CDATA[https://sunplastpipe5.en.ec21.com/Steel_Backing_Rings--11597161_11816193.html]]></link><description><![CDATA[cases or palletsMOQ 
Negotiable 
Production lead time 
10-15 days for a 20ft container, 20-25 days for a 40ft container. 
Warranty time 
1 years for normal use 
Payment term 
T/T or LC at sight 
FOB ]]></description><pubDate><![CDATA[20230706]]></pubDate></item>
<item>
<title><![CDATA[Drum Couplings]]></title><link><![CDATA[https://naracorp.en.ec21.com/Drum_Couplings--253105_253258.html]]></link><description><![CDATA[580
138
730
69,898
38,776
260
400
35
600
729
730
580
850
81
13
85.5
34
59
450
8
715
208
* Weight &amp; GD2 are the values in case of solid shaft.
]]></description><pubDate><![CDATA[20081110]]></pubDate></item>

</channel>
</rss>