<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - manual argon]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/manual_argon--2673/1/manual argon.html]]></link><item>
<title><![CDATA[Superior Quality A1-17 Atmosphere Sintering Furnace]]></title><link><![CDATA[https://haoyuefurnace.en.ec21.com/Superior_Quality_A1_17_Atmosphere--11953323_11953360.html]]></link><description><![CDATA[Liter
Max.Working Pressure
≤0.1MPa
Max.Vacuum
100Pa（1torr）
Thermocouple
B-Type
Cooling Method
Natural cooling
Gases
Nitrogen,Argon,Oxygen,Air,etc
Control Method
Manual / automatic free switch
]]></description><pubDate><![CDATA[20240618]]></pubDate></item>
<item>
<title><![CDATA[AccuThermo AW 610M Rapid Thermal Annealing]]></title><link><![CDATA[https://allwin21.en.ec21.com/AccuThermo_AW_610M_Rapid_Thermal--9759759_9763382.html]]></link><description><![CDATA[Type: The most popular , production proven model of Desktop, Atmospheric, Manual Load/Unload RTP RTA RTO RTN. Q and A on RTP equipment.
New Options: Add Double O Ring and/or O2 Sensor/Analyzer for O2]]></description><pubDate><![CDATA[20240514]]></pubDate></item>
<item>
<title><![CDATA[Air Vacuum Quenching Furnace Hardening for Extrusion Die Air-Cooled Horizontal]]></title><link><![CDATA[https://furnacevac.en.ec21.com/Air_Vacuum_Quenching_Furnace_Hardening--11856448_11856449.html]]></link><description><![CDATA[argon. The quench blower then activates, forcing the gas through quench nozzles located circumferentially in a manifold that is part of the hot zone and into the hot load. As the gas passes over the ]]></description><pubDate><![CDATA[20231019]]></pubDate></item>
<item>
<title><![CDATA[Metal Halide Lamp Production Line (General and PSL)]]></title><link><![CDATA[https://standardpart.en.ec21.com/Metal_Halide_Lamp_Production_Line--885073_887037.html]]></link><description><![CDATA[Manual tubing works
Formed body pinch 
Glov Box
Automatic super heater
2-head exhaust machine
Arc tube seasoning bench
Flame spray coater
CRT bench
Automatic tube glazing
Required utility
H. P air:10]]></description><pubDate><![CDATA[20080604]]></pubDate></item>
<item>
<title><![CDATA[CX-250/630zf Electro Fusion Wire Laying Equipment]]></title><link><![CDATA[https://electrofusion.en.ec21.com/CX_250_630zf_Electro_Fusion--10288026_10288032.html]]></link><description><![CDATA[manually.
2 Cutting inner surface of pipe fittings as per CNC Programming.Achieve required size
3 Embedding wires into pipe inner surface as per CNC Programming, meet design demands` pitch.(wire layi]]></description><pubDate><![CDATA[20170124]]></pubDate></item>

</channel>
</rss>