<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - two piece can lids]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/two_piece_can_lids--2673/1/two piece can lids.html]]></link><item>
<title><![CDATA[Central Heating Boiler]]></title><link><![CDATA[https://kozlusan.en.ec21.com/Central_Heating_Boiler--2654355_2654465.html]]></link><description><![CDATA[can meet the demand for nearly 2 or 3 days.
Fuel-Feeding Control: Two-timely time relays are used in the boiler.Factory product is adjusted according to small coal pieces.
Fuel-Feeding and Temperatur]]></description><pubDate><![CDATA[20231129]]></pubDate></item>
<item>
<title><![CDATA[Pit Heating Furnace]]></title><link><![CDATA[https://chenchr.en.ec21.com/Pit_Heating_Furnace--9381136_9855889.html]]></link><description><![CDATA[Lid with integral and fractional two structures lid to open and close with manual lever mechanism, electro-hydraulic mechanism, manual worm mechanism, electric conveyor-agency approach. Workpiece usi]]></description><pubDate><![CDATA[20160213]]></pubDate></item>

</channel>
</rss>