<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - shaft lock]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/shaft-lock--1814/1/shaft lock.html]]></link><item>
<title><![CDATA[Piston Assembly, Piston Rod]]></title><link><![CDATA[https://jnkx1987.en.ec21.com/Piston-Assembly-Piston-Rod--11957409_12019116.html]]></link><description><![CDATA[Lock nut M22
T507-301.00
Cylinder assembly
AH100101050100 
AH33001-05.01A.00
Bolt 420101121110009000
M10X90(GB70-85) 
Lock nut M30
T507-306.00
Cylinder head flange
AH0501010502 
AH35001-05.02
Cross h]]></description><pubDate><![CDATA[20241106]]></pubDate></item>
<item>
<title><![CDATA[Mission Magnum XP Pump Spare Parts 12x10x23 24027-02-30]]></title><link><![CDATA[https://missionslurrypump.en.ec21.com/Mission-Magnum-XP-Pump-Spare--11921620_12005003.html]]></link><description><![CDATA[shaft rotation to maintain continuous operation of the pump.
Shaft Sleeves: Provides corrosion and wear resistance, extending the service life of the pump shaft.
Personalized Solutions
In addition to]]></description><pubDate><![CDATA[20240914]]></pubDate></item>
<item>
<title><![CDATA[Buoy Submersible Pump]]></title><link><![CDATA[https://zlwaterpump.en.ec21.com/Buoy-Submersible-Pump--11104681_11104699.html]]></link><description><![CDATA[shaft and bearing shell for pre-moisturizing
4.Before starting the deep well pump,the inspection items should meet the following
Requirements: 
1.Base bolts have been tightened.
2.The axial clearance]]></description><pubDate><![CDATA[20210302]]></pubDate></item>
<item>
<title><![CDATA[100TJQ Submersible Slurry Pump]]></title><link><![CDATA[https://tobeetony09.en.ec21.com/100TJQ-Submersible-Slurry-Pump--11720710_11722778.html]]></link><description><![CDATA[shaft, closed impeller, large open passages for easy passage of solids, heavy duty shaft and bearing configuration, special seals working in an oil bath and 4, 6, 8 or 10 pole customs built electric ]]></description><pubDate><![CDATA[20230207]]></pubDate></item>
<item>
<title><![CDATA[2SK-3 7.5kw Double Stage Liquid Ring Vacuum Pump]]></title><link><![CDATA[https://cece0126.en.ec21.com/2SK-3-7.5kw-Double-Stage--10858650_10859213.html]]></link><description><![CDATA[shaft(2) with pins, and between the two impellers, it is fixed by shaft sleeve(20) and locked with round nut so it forms rotor. The two impellers eccentrically installed inside the pump body and supp]]></description><pubDate><![CDATA[20181123]]></pubDate></item>

</channel>
</rss>