<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - concrete formwork]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/concrete_formwork--2850/1/concrete formwork.html]]></link><item>
<title><![CDATA[Pecafil Permanent Formwork for Concrete Accessories]]></title><link><![CDATA[https://bruce886.en.ec21.com/Pecafil_Permanent_Formwork_for_Concrete--652073_12048000.html]]></link><description><![CDATA[concrete poursUses steel inner-cage for Pecaform supportBackfilled with sub-grade against earth and pecaform.Allows for immediate concrete pour - NO DOWNTIME.Allows for same day finish - UP TO 50% TI]]></description><pubDate><![CDATA[20250310]]></pubDate></item>
<item>
<title><![CDATA[High Tensile Strength 7 Wire PC Strand]]></title><link><![CDATA[https://yxmaterial.en.ec21.com/High_Tensile_Strength_7_Wire--11854868_12051061.html]]></link><description><![CDATA[concrete has cured, reducing the time required for formwork, concrete curing, and overall project completion. This can result in cost savings and earlier occupancy or utilization of the structure.
7.]]></description><pubDate><![CDATA[20250321]]></pubDate></item>

</channel>
</rss>