<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - specification slab]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/specification_slab--2850/1/specification slab.html]]></link><item>
<title><![CDATA[Post Tension and Construction Equipment]]></title><link><![CDATA[https://yxmaterial.en.ec21.com/Post_Tension_and_Construction_Equipment--11854868_12051066.html]]></link><description><![CDATA[SPECIFICATIONS
Item
Nominal tensioning force (KN)
Nominal oil pressure (KG)
Tensile Area piston (m2)
Area of drawback piston (m2)
Return oil pressure (mpa)
Diameter of center hole (mm)
Tensioning str]]></description><pubDate><![CDATA[20250321]]></pubDate></item>
<item>
<title><![CDATA[Pecafil Permanent Formwork for Concrete Accessories]]></title><link><![CDATA[https://bruce886.en.ec21.com/Pecafil_Permanent_Formwork_for_Concrete--652073_12048000.html]]></link><description><![CDATA[specifications. The strength and versatility of Pecaform makes it the natural choice for applications such as ground beams, footings and bases, pile caps, construction joints (stop ends), special sha]]></description><pubDate><![CDATA[20250310]]></pubDate></item>
<item>
<title><![CDATA[Steel Fiber]]></title><link><![CDATA[https://infrageo.en.ec21.com/Steel_Fiber--882429_882488.html]]></link><description><![CDATA[specifications for ready-mixed concrete uniformity requirements.
- Placing : Conventional equipments like hand screeds, vibratory screeds can be used for 
pumping and placing. 
- Finishing : Conventi]]></description><pubDate><![CDATA[20050704]]></pubDate></item>

</channel>
</rss>