<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - commissioning]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/commissioning--2717/1/commissioning.html]]></link><item>
<title><![CDATA[GF018A Clamp Type Multimeter Calibrator]]></title><link><![CDATA[https://gfuvegroup.en.ec21.com/GF018A-Clamp-Type-Multimeter-Calibrator--11546876_11999025.html]]></link><description><![CDATA[ISO17025 Electrical laboratory;
■ Electricity power bureau &amp; power company;
■ Power engineering commissioning company;
■ Electrical Department of industrial and mining enterprises;
]]></description><pubDate><![CDATA[20240905]]></pubDate></item>
<item>
<title><![CDATA[LM-79 Moving Detector Type C Goniophotometer]]></title><link><![CDATA[https://15317383997.en.ec21.com/LM-79-Moving-Detector-Type--11812738_11812739.html]]></link><description><![CDATA[What is type C goniophotometer definition?LSG-6000 Moving Detector Goniophotometer (Mirror Type C) was manufactured by LISUN completely meets LM-79-19, IES LM-80-08, COMMISSION DELEGATED REGULATION (]]></description><pubDate><![CDATA[20231024]]></pubDate></item>
<item>
<title><![CDATA[Lamp Start, Run-up Time and Flicker Test System]]></title><link><![CDATA[https://lisungroup1.en.ec21.com/Lamp-Start-Run-up--9657760_11802787.html]]></link><description><![CDATA[COMMISSION DELEGATED REGULATION (EU) 2019/2015, COMMISSION REGULATION (EU) 2019/2020 and IEC60969 “Self-ballasted Lamps for General Lighting Services—Performance Requirements” and other require]]></description><pubDate><![CDATA[20230907]]></pubDate></item>
<item>
<title><![CDATA[Current Injection Test]]></title><link><![CDATA[https://gfuve0123.en.ec21.com/Current-Injection-Test--10658139_10668018.html]]></link><description><![CDATA[commissioning needs large current place, used in power plants, substations, electrical manufacturers and scientific research, laboratory and other units, belonging to short-term or intermittent worki]]></description><pubDate><![CDATA[20180509]]></pubDate></item>
<item>
<title><![CDATA[Lamp Start, Run-up Time and Flicker Test System]]></title><link><![CDATA[https://lisungroup7.en.ec21.com/Lamp-Start-Run-up--11882688_11882695.html]]></link><description><![CDATA[COMMISSION DELEGATED REGULATION (EU) 2019/2015, COMMISSION REGULATION (EU) 2019/2020 and IEC60969 “Self-ballasted Lamps for General Lighting Services—Performance Requirements” and other require]]></description><pubDate><![CDATA[20240102]]></pubDate></item>
<item>
<title><![CDATA[Ponovo PW41i Protection Relay Test Set Three-Phase Relay Protection Tester]]></title><link><![CDATA[https://xiaxiaoming.en.ec21.com/Ponovo-PW41i-Protection-Relay-Test--7403753_7404016.html]]></link><description><![CDATA[commissioning work in distribution grid.
More Options for Different Testing Requirement 
*PW41i‐standard version, 3×40A and 3×300V, with local system testings only*PW41i‐advanced version, 3×40]]></description><pubDate><![CDATA[20230609]]></pubDate></item>

</channel>
</rss>