<?xml version="1.0" encoding="utf-8" ?>
<rss version="2.0">
<channel>
<title><![CDATA[EC21 Product Catalogs - trailing suction hopper dredger]]></title>
<link><![CDATA[https://www.ec21.com/ec-market/trailing suction hopper dredger.html]]></link><item>
<title><![CDATA[China Origin Advanced Booster Pump Set for 1000m-3000m Dredging]]></title><link><![CDATA[https://nico23.en.ec21.com/China_Origin_Advanced_Booster_Pump--12043339_12043342.html]]></link><description><![CDATA[trailing suction hopper dredgers and cutter suction dredgers. These indispensable stations come into play when the desired discharge length surpasses the limits of the primary dredging pump. By strat]]></description><pubDate><![CDATA[20250217]]></pubDate></item>
<item>
<title><![CDATA[Split Hopper Barge 100cbm To 3000cbm Hopper Barge 500m3 1000m3 1500m3 2000m3 3000m3]]></title><link><![CDATA[https://dhcinternational.en.ec21.com/Split_Hopper_Barge_100cbm_To--10973157_10973187.html]]></link><description><![CDATA[sell hopper barge 100cbm to 3000cbm.
sell grab dredger/clamshell dredger 3cbm to 50cbm.
trailing suction/cutter suction dredger 1000cbm to 10000cbm.
whatsapp +86 138 171 62863
]]></description><pubDate><![CDATA[20190627]]></pubDate></item>
<item>
<title><![CDATA[Dredging Drag Head / Drag Head / Draghead]]></title><link><![CDATA[https://william32.en.ec21.com/Dredging_Drag_Head_Drag_Head--7622177_8616395.html]]></link><description><![CDATA[Trailing Suction Hoppedredger(TSHD) is minimum dredging cycle time and hopper loading time. Hopper loading time is strongly determined by the performance of the underwater excavating mechanism;the dr]]></description><pubDate><![CDATA[20131115]]></pubDate></item>

</channel>
</rss>