Search Advanced Search

Durable Aluminium Concrete Formwork High Recovery Value Aluminum Formwork

Price
US$ 120
Min Order Quantity 300 / sq
Supply Ability 20000 Square meters per month
Port Tianjin
Delivery Lead Time 45days
  • Share to :
  • Pinterest
Contact Now* Send an Inquiry to this supplier.
or
Start Order * Name your price

Quick Information

  • Brand Name :Boyang
  • Place of Origin :China

Description

Aluminum Formwork System

As a new formwork system, aluminum quick-release template system has an application history of nearly 50 years ever since the birth in U.S. in 1962 and has been widely applied in construction in developed countries like U.S. and Canada and newly rising industrial countries like Mexico, Brazil, Malaysia, ROK and India.

Material: 6061-T6  6063-T6
Bearing capacity:60KN/m2
Weight:25-30kg/m2
Hardness:about 13webster
Color:silver white


Four Major Aluminum Template Systems
Template System:
To constitute the closed surface desired for concrete structure construction and ensure the forming of construction structure in concrete pouring.
Accessory System:
To connect single pieces of templates into a whole system, as connecting template member.
Support System:
To play a supporting role in the process of concrete structure construction and ensure floors, beam bottoms and cantilevered structures to be held steadily.
Fastening System:
To guarantee the width dimensions of structured formed by templates and ensure no template deformation, expansion or explosion in the process of concrete pouring.


Analysis on Standard Five-day Construction Period
1) Day 1:Measure, lay off, bundle wall rebars and complete water and electricity performing and embedding
2) 07:00-12:00 in Day 2:Remove wall boards of lower level and transfer to the upper level for installation of wall column template
3) 14:00 in Day 2 - 18:00 in Day 3:Remove wall boards of lower level and transfer to the upper level for installation
4) 07:00-15:00 in Day 4:Bundle beam rebars, erect cantilevered structures for template construction, and adjust and strengthen wall column templates
5) 15:00 in Day 4 - 15:00 in Day 5:Bundle floor slab rebars and alternate water and electricity performing and embedding
6) 15:00-17:00 in Day 5:Clean the floor, recheck dimensions and prepare for concrete pouring
7) 17:00-23:00 in Day 5:Concrete pouring

Main advantage: 
1. total system forms the complete concrete structure
2. convenient
3. easy operation
4. high quality
5. light and great flexibitity
6. durable, made of special alloy aluminum
7. no need for rehabilitation, no risk of rust and corrosion
8. fast installation owing to its special design
9. speed of construction-4-days each floor construction cycle.
10. Formwork can be re-used over 300 times.
11. No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.

 

Price

  • Price Condition : FOB
  • Price : USD 120 / sq
  • Delivery Port : Tianjin

Packaging & Delivery

  • Packing : or as per customers' request
  • Delivery Lead Time : 45days
  • Minimum Order : 300
  • Supply Ability : 20000 Square meters per month

Product Image

  • Durable Aluminium Concrete Formwork High Recovery Value Aluminum Formwork

Send an Inquiry to this supplier

Durable Aluminium Concrete Formwork High Recovery Value ...

Durable Aluminium Concrete Formwork High Recovery Value ...

Send an Inquiry to this supplier
* From
  To Ms.Li Bella
Hebei Boyang Hardware Product Co.,Ltd
* Buying Product
- Please enter your specific buying item.
e.g. 42 inch LCD TV, leather executive chair
Category : Formwork
* Messages

Use English only Max. 2000 characters. (Min. 20)

Send

Similar products in other categories :

  • Construction & Real Estate >
  • Formwork
  • Search

    Browse: Manufacturer Directory Countries China India Korea Premium Suppliers Community Site Map

    About EC21 Contact Us Terms & Conditions Report Item Online Trading Risks Product Listing Policy

    中文 繁體 한국어 日本語 Español Русский Français Deutsch

    Copyright (c)1997-2017 EC21 Inc. All Rights Reserved. EC21 in KoreanChinese

    Business Registry Number: 120-86-03931

    Inquiry Basket ()