How to select a suitable industrial microwave oven
Step 1: Determine How Much Water You Need To Evaporate With any given material, you will first need to measure the origianl mositure content before drying and determine a target moisture content after being processed. For example, if you have 200 kilograms of material and the original moisture content is 60% , then you want to get the 10% moisture content dehydrated products. the calculation is : 200*(0.6-0.1)= 100 kilograms of water. Meanwhile, you need consider how long the equipment need to work each day. So, let's say you are trying to evaporate 100 kg of water in two hours. Let's assume the starting temperature of the material is 20°C.
Step 2: Understand How Your Material Will React To Microwaves For most materials, water will easily be the most microwave sensitive molecule and will therefore minimize the amount of energy lost through absorption to the rest of the material you are trying to dry. The calculations to follow are specific to the amount of energy required to evaporate the water alone and so should serve as a rough estimate of the total energy you will need since some small part will be lost to the rest of thematerial. However, this loss should be small (less than 5% in most cases). If you have a material with a high dielectric loss tangent though, this will be larger. Also, if you have a material that is highly receptive to microwaves then you may want to consider drying over a longer time period to avoid unwanted heating of the base material.
Step 3: Apply This Formula To Understand Energy Needs The formula for calculating the amount of energy required to evaporate water is based on the specific heat capacity of water; 4.184 kilojoules (kJ) of energy is required to heat one kilogram of water by one degree Celsius. Once this energy heats water to its boiling point (100°C), roughly another 2600 kJ are then required to phase shift one kilogram of liquid water to steam. So, the calculations for the amount of energy required in our earlier example (100 kg of water in two hour) would be as follows: Energy required to heat water to boiling + energy required to phase shift the water = Total (4.184*weight of water in kg*change in temperature in celcius) + (2600*weight of water in kg) = Total (4.184*100*(100-20))+(2600*100) = 293,472 kJ Since this amount of energy needs to be applied over the course of two hours (7,200 seconds), then 293472/7200 = 40.76 kJ/sec = 40.76 kilowatts. Our total energy requirement is therefore 293,472 kJ which equates to a continuous application of 40.76 kw over two hours.
Step 4: Use This Information To Make An Informed Decision Knowing your energy requirements up-front will save you time when considering purchasing a microwave oven. When talking with high-power microwave manufacturers, this will be the first data point necessary to establish before more productive conversation can be had about pricing a specific oven or system. For instance, in the example above, the amount of energy required could be supplied by one standard 40-55 kW generator. However, if the drying had to be done in 20 minutes instead of two hours then three generators would be required to produce the 130-150 kW required. Energy requirements are also crucial when building a business case for making an investment in new drying systems for your facility. Justifications of this kind are crucial when considering large capital purchases like commercial microwave dryers.
OUR ADVANTAGE
1. The magnetron is equipped with a new type of water-cooled jacket;
2. Transformer oil-return continuous cooling;
3. Magnetron connection tube and transformer connection tube both use copper pipe (to prevent oil leakage );
4. Water and oil circuit using centralized heat transfer cooling (long-term operation temperature of the magnetron does not exceed 55 degrees, the long-term operation temperature of the transformer does not exceed 50 degrees);
5. Transformers, high voltage capacitors and silicon reactor installed for the closed structure, with moisture, dust double protection.
6. All electrical control appliances and wires are provide by the "3C" certified suppliers.
7. The control system uses PLC conjunction with touch screen fully automatic control. Therefore, our equipment can be 30 days without downtime for normal work!
Our Promise
- Feedback within 24 hours.
- Free customized layout and install design.
- One year warranty for whole machine.
- Best prices as we are a manufacturer.
- OEM and ODM is acceptable.