Archive Results for flow meter : 3 Buying Leads (BEFORE January 1st, 2015).
- 29 Jul, 2012
- flow rate is 4 cubic meter per hour and also feeding temperature in to the heat exchanger is 27 celsius and out let should above 87 Celsius(87-89).
properties of spent wash is density 1000,heat capacity 4200,viscosity 0.00089,thermal conductivity 0.609 in same units and flow rate is 3.662 cubic met
-
Categories : General Industrial Equipment, Boilers
Sri Lanka
- Contact Now
- 29 Jul, 2012
- flow rate is 4 cubic meter per hour and also feeding temperature in to the heat exchanger is 27 celsius and out let should above 87 Celsius(87-89).
properties of spent wash is density 1000,heat capacity 4200,viscosity 0.00089,thermal conductivity 0.609 in same units and flow rate is 3.662 cubic met
-
Categories : Food & Beverage, Milk
Sri Lanka
- Contact Now
- 29 Jul, 2012
- flow rate is 4 cubic meter per hour and also feeding temperature in to the heat exchanger is 27 celsius and out let should above 87 Celsius(87-89).
properties of spent wash is density 1000,heat capacity 4200,viscosity 0.00089,thermal conductivity 0.609 in same units and flow rate is 3.662 cubic met
-
Categories : Minerals & Metallurgy, Stainless Steel Pipes
Sri Lanka
- Contact Now