Min. Order:
1 set
Place of origin:
China
Price Condition:
FOB Shanghai
Supply Ability:
50 Sets per Month
machine occupies very little time of the staff. The staff of each process can take into account defect repair, and won’t waste time.
2. No high requirement on technical staff
Manual re-plating of layout defects has high requirements on technical level of the staff, including the control and coordination of temperature, voltage, current, and moving speed of re-plating pen. It is difficult
[Related Keywords : plating machine, automatic plating machine, repair plating machine, gravure cylinder plating]