- Group Products
- All Products
- 1 Product Per Company
- Supplier Country
-
- China (1)
- Search Options
- Show Premium Suppliers
- Subscription
- Trade Alert
Notify me of new Flow through Racks info. - RSS Feeds
- My Recent History
Min. Order:
1 Set
Price:
US$ 8000
Place of origin:
China
Preset test time: the maximum test time is 99 hours and 59 minutes;• Heating system: The circulating air duct is equipped with a heater to heat the dust to avoid dust condensation. The heat of the muffler mica sheet heating ring is safe and stable.• Vacuum system: equipped with vacuum pump, vacuum pressure, air filtration, flow meter, pressure regulating triplet, connecting pipe.
[Related Keywords : Dust Proof Chamber]
Business Type
Manufacturer
Location
Shanghai, China
Employees Total
11 - 50
Annual Revenue
USD 1,000,001 - 2,000,000
![]() |
Recommended Content