Min. Order:
1 Piece
Price:
US$ 10000
Place of origin:
China
coding. Assembly as per the drawing from Vertex BD software.
LGS Production System with Two Features:
Feature 1. Material Saving:
With the output code of Vertex software, there is always an inevitable material waste of 45-50mm when it comes to one part with chamfer cut or with flat cut, such wastage can amazingly reach 1.7-2.1%. Based on above calculation, a yearly production of 5000 Tonapproxi
[Related Keywords : steel forming machines, steel frame solution, metal framing machine, light steel frame machine]