Min. Order:
20 MT
Price:
USD 280
Place of origin:
China
Price Condition:
FOB Tianjin
Supply Ability:
200000Mt per year
frozen surfaces. Use a method of consolidation that eliminates air voids. To extend working time, retarding admixture can be applied.
Temperature:
Warm environmental and materials temperatures will reduce the working time of CSA Concrete Repair Material Mix. To compensate for warm temperatures, keep material cool and use chilled mix water. Temperatures below 20ºC will decrease the rate of
[Related Keywords : Concrete repair material, Road repair, Pavement repair, construction repair]