There are 371 drilling rigs from 111 suppliers on EC21.com
Related Searches : machine , machinery , oil purifier , filter , hardware , cutting machine , oil recycling , oil filter
Price
Supplier Info.
Report Item
Your report on Product(s) will be sent to EC21 Administrators once submitted.
Then, Administrators will investigate and then take appropriate actions.
Contact Supplier
Tefico---a manufacturer and exporter of onshore rotary drilling rig and relative components since 2000.
1. Cost-effective
2. Excellent quality
3. Fast delivery
Complete land drilling rig package
1. API Spec 4F and API Spec 7K
2. Over 10 years manufacturing experience
3. Reasonable price with fast delivery
4. Reliable after sales service.
|
Drilling rig model |
ZJ30/1700LDB |
ZJ40/1700LDB |
ZJ50/3150LDB |
ZJ70/4500LDB/LD |
|
|
Nominal drilling depth, m |
114mm(4 1/2”)Drill pipe |
1500-2500 |
2500-4000 |
3500-5000 |
4500-7000 |
|
127mm(5”)Drill pipe |
1600-3000 |
2000-3200 |
2800-3500 |
4000-6000 |
|
|
Max. hook load, kN |
1700 |
2250 |
3150 |
4500 |
|
|
Hook speed, m / s |
0.22-1.63 |
0.21-1.35 |
0.21-1.39 |
0.21-1.36/0.25-1.91 |
|
|
Traveling line |
10 |
10 |
12 |
12 |
|
|
Drill line diameter, mm |
29 |
32 |
35 |
38 |
|
|
Max. pull of fast line, kN |
210 |
280 |
350 |
485 |
|
|
Drawworks |
Model |
JC30B |
JC40B |
JC50B |
JC70B |
|
Rated Power kW |
400 |
735 |
1100 |
1470 |
|
|
Speed |
4F |
6F+1R |
4F+2R |
6F(4F)+2R |
|
|
Main brake |
Hydraulic disc brake |
||||
|
Auxiliary brake |
Eddy brake |
||||
|
Crown brake |
TC170 |
TC225 |
TC315 |
TC450 |
|
|
Traveling block |
YG170 |
YC225 |
YC315 |
YC450 |
|
|
Sheave OD of hoisting system, mm |
1005 |
1120 |
1270 |
1524 |
|
|
Hook |
G170 |
DG225 |
DG315 |
DG450 |
|
|
Swivel |
Model |
SL170 |
SL225 |
SL450 |
SL450 |
|
Stem dia, mm |
64 |
75 |
75 |
75 |
|
|
Rotary table |
Table opening mm |
520.7 |
698.5 |
698.5 |
952.5 |
|
Speed |
Ⅰ,smooth change |
Ⅰor Ⅱ, smooth change |
|||
|
Drive mode |
VFD MOTOR |
VFD/DC motor |
|||
|
Mast |
Type |
K |
|||
|
Height, m |
42 |
43 |
45 |
45 |
|
|
Max. load, kN |
1700 |
2250 |
3150 |
4500 |
|
|
Sub structure |
Type |
Box |
Front level, swing lift, rear level, box |
||
|
Floor height, m |
Front 6, rear 0.8 |
Front 9,rear0.8 |
Front 9,rear0.8 |
Front 10.5, rear 0.8 |
|
|
Clear height, m |
2.9 |
4.8 |
7.4 |
7.4 or 8.9 |
|
|
Mud pump |
Model*number |
F-1300*1 |
F-1300*2 |
F-1300*2 |
F-1600*2 |
|
Drive mode |
Compound drive |
||||
|
Rotary electric drive mode |
AC-DC-AC or AC-SCR-DC, one for one control |
||||
|
Total power, kW |
2*810 |
3*810 |
3*810 |
3*1000 or 4*810 |
|
| Registration Date | 2013/01/22(Year/Month/Date) |
|---|---|
| Buyer / Seller in EC21 | Seller |
| Business Type | Manufacturer |
| Year established | 2000 |
| Employees total | 101 - 500 |
| Annual revenue | USD 10,000,001 - 50,000,000 |
| Company | Shaanxi Tefico Petroleum Mechanical & Electric New Technology Co., Ltd.(Head Factory) |
|---|---|
| Address | No. 300, West Segment of Xinfu Road, Baoji, Shaanxi, ChinaBaojiShanxii721000China |
| Phone | 86 - 0917 - 3668388 |
| Fax | 86 - 0917 - 3667909 |
| Homepage | http://www.teficopetro.com |
| Contact | Susan Lee / Overseas |