Min. Order:
one 20ft container
Place of origin:
China
Supply Ability:
100000T/month
three dimensional direction, moreover assembled fast, reduces effort, to avoid the bolt work and scattered buckle, reduced the labor intensity, the speed is above conventional scaffold 5 times, can facilitate assembles many kinds of load strength the scaffold and each kind of support heavy frame structure stable reliable.The primary member includes: The erecting pole, the cross rod, the strut, re
[Related Keywords : scaffolding, formwork, concrete scaffolding, steel scaffolding]